GC-1 or RC-1 for the construction of Felegebrihan -Bahir Dar Road Project, Contract-2

Published: Monday, 10 February 2014 Written by The Ethiopian Herald Saturday 08 February 2014 Page 09

The Ethiopian Roads Authority (ERA) invites eligible Contractors of Category GC-1 or RC-1 for the construction of Felegebrihan -Bahir Dar Road Project, Contract-2 Zema River Bridge-Felegebirhan .

 


The project road is located in the North west part of Ethiopia, Amhara Regional Stat. The works Under this contract consists of the construction of 83 Km of the Felegebirhan -Bahir Dar Road Project Contract ll (Zema River Bridge to Felegebrihan) The project road starts from Zema river Bridge, which is located at a distance of 395 km North West of Addis Ababa and stretches to South East direction and ends at Felegebrhian town. The road shall be constructed to DS4 road class (ERA's Geometric Design Manual-2002) with an Asphalt Concrete carriageway of thickness 50mm and it shall have a cross section of 10m (7m AC carriageway and 1.5m gravel shoulder on each side) or as per the drawings. The work also includes the construction of minor and major drainage structures. The period of construction is 1096 calendar days, inclosing 90 days of mobilization period.

Submission: Bids must be submitted to the director general before April 24, 2014 at 2:30PM

Tel : 251 11 515 66 03

This announcement is published on : The Ethiopian Herald Saturday 08 February 2014 Page 09



Hits: 752